Construction & installation companies «Belselelectrosetstroy» JSC

Eight construction & installation companies of «Belselelectrosetstroy» JSC perform the entire range of construction, erection and installation services for 0.38-110 kV cable and overhead power lines and transformer substations.

When laying power networks, «Belselelectrosetstroy» JSC employs and implements widely most advanced high-tech solutions.

Presently, «Belselelectrosetstroy» JSC proves to be a high-capacity power industry enterprise with well-developed production and construction facilities equipped with all construction equipment, tools and mechanisms as may be required.

Major business:

Design and construction of 1st and 2nd risk level buildings and structures and engineering research for these purposes

1. Project documentation development:

  • general layout and logistic map;
  • building solutions;
  • engineering equipment, networks and systems of heat & water supply, sewage, heating and ventilation, electricity, electric equipment and electric lighting;
  • iIndustrial process solutions (design of electrical engineering and construction production facilities).

2. General Contractor functions.

3. Building and other special-purpose installation works:

  • mechanized earthworks and special soil works (boring) for making foundations and basements and for cable laying;
  • stone construction arrangements;
  • installation of prefabricated concrete and reinforced concrete structure;
  • carrying wood structure installation and arrangement;
  • roofing and plumbing;
  • waterproofing and insulation works;
  • electrical installations (construction of power supply and lighting systems and networks).

Major customers:

  • Regional companies of "Belenergo" Group;
  • Capital Construction Divisions of Regional Executive Committees and Municipalities;
  • Belarusian Railway;
  • Minsk Metro;
  • Russian power suppliers and enterprises;

Construction Company ¹1

Picture gallery:

Detached transformer substation, made of fast-assembly prefabricated blocks, with overhead inputs 10 kV overhead power transmission line (dimensions for 35 kV upgrade)
Detached transformer substation, made of fast-assembly prefabricated blocks, with overhead inputs 10 kV overhead power transmission line (dimensions for 35 kV upgrade)

Contact details:

112/1, Krasnogvardeyskaya Str., Brest, 224024
Fax: 0162-27-15-55
Reception: 0162-45-42-15
Director: 0162-45-21-47
Chief engineer: 0162-45-20-94
Production Department: 0162-45-23-77
Å-mail: smu1_br@tut.by


Construction Company ¹3

Picture gallery:

Detached transformer substation, made of fast-assembly prefabricated blocks, with cable inputs and hipped roof 0.4 kV and 10 kV overhead power lines with pole-type substation
Detached transformer substation, made of fast-assembly prefabricated blocks, with cable inputs and hipped roof 0.4 kV and 10 kV overhead power lines with pole-type substation

Contact details:

236, Barykina Str., Gomel, 246020
Fax: 0232-42-12-16
Reception: 0232-42-24-23
Director: 0232-42-12-12
Chief engineer: 0232-42-12-42
Production Department: 0232-42-06-62
Å-mail: CMY-3_BSESS@TUT.BY


Construction Company ¹4

Picture gallery:

Installation of twin 0.4 kV overhead power line 0.4 kV overhead power line (lighting)
Installation of twin 0.4 kV overhead power line 0.4 kV overhead power line (lighting)

Contact details:

18, Skidelskoye Shosse, Grodno, 230003
Fax: 0152-75-55-66
Reception: 0152-75-55-66
Director: 0152-75-55-70
Chief engineer: 0152-75-55-95
Production Department: 0152-75-56-24
Å-mail: smy-4_priem@mail.ru


Construction Company ¹5

Picture gallery:

Quay lighting (decorative luminaires) Overhead line with SAPss cables and ZKU01-70 lamps
Quay lighting (decorative luminaires) Overhead line with SAPss cables and ZKU01-70 lamps

Contact details:

167, Libavo-Romenskaya Str., Molodechno, 222310
Fax: (0176) 54-26-33
Reception: (0176) 54-26-33
Director: (0176) 54-26-36
Chief engineer: (0176) 54-26-31
Production Department: (0176) 54-26-37
e-mail: smy5@tut.by


Construction Company ¹6

Picture gallery:

Overhead line with SAPss cables and ZKU01-70 lamps 10 kV overhead power transmission line with bare wiring
Overhead line with SAPss cables and ZKU01-70 lamps 10 kV overhead power transmission line with bare wiring

Contact details:

174, Chelyuskintsev Str., Mogilev, 212013
Fax: 0222-31-46-12
Reception: 0222-31-46-58
Director: 0222-31-46-60
Chief engineer: 0222-31-46-80
Production Department: 0222-31-46-12
Å-mail: SMU_6@TUT.BY


Construction Company ¹7

Picture gallery:

Pole-mounted transformer substation Two 10 kV overhead power transmission lines
Pole-mounted transformer substation Two 10 kV overhead power transmission lines

Contact details:

16, Olshevskogo Str., Minsk, 220073
Fax: 017-204-32-59
Reception: 017-204-32-59
Director: 017-204-73-85
Chief engineer: 017-204-08-41
Production Department: 017-204-02-08
Å-mail: peo.smu7.bsess@tut.by


Mobile Construction Motor Equipment Company ¹3

Picture gallery:

10 kV overhead power transmission line Street lighting 10 kV overhead power line construction in progress 110 kV high-voltage overhead power line
10 kV overhead power transmission line Street lighting 10 kV overhead power line construction in progress 110 kV high-voltage overhead power line

Contact details:

143, Gorkogo Str., Vitebsk, 210008
Fax: 0212-34-29-16
Reception: 0212-34-29-16
Director: 0212-34-30-43
Chief engineer: 0212-34-27-41
Production Department: 0212-34-21-72
Å-mail: pmk3new@gmail.com